This project was a new recreation center built for Benedictine College. The majority of the exterior frames had gothic arches, and the aluminum material needed to be rolled to match the radius of the steel lintel. To accomplish this, we had to send the material to a third party with detailed drawings to show the pieces and the radius that it would need to be matched to. The entire process from the time we shipped the material off until the time we received it back was about five weeks, so we had to ensure that all the information we sent was 100% correct so that the project wouldn’t be delayed. Everyone was very happy with how the finished project turned out!

 